---
title: "Utility Analysis, Explained: Five Adjustments Cut the Median Estimate by 91%"
description: "Utility analysis turns an assessment or training decision into a monetary figure. A 10,000-scenario simulation found the standard adjustments cut the median estimate by 91% and made 16% negative. The formula, the terms that matter, and how to present a number people believe."
canonical: https://www.assessall.com/blog/utility-analysis-explained-five-adjustments-cut-the-median-estimate-by-91
published: 2026-11-24
updated: 2026-11-24
author: "AssessAll Editorial"
source: AssessAll
---

# Utility Analysis, Explained: Five Adjustments Cut the Median Estimate by 91%

Utility analysis turns an assessment or training decision into a monetary figure. A 10,000-scenario simulation found the standard adjustments cut the median estimate by 91% and made 16% negative. The formula, the terms that matter, and how to present a number people believe.

Utility analysis is the method for converting an assessment or training decision into a monetary figure. It multiplies how many people you select, how long they stay, how well the instrument predicts performance, and what a standard deviation of performance is worth in money — then subtracts what the programme cost. The output is a currency estimate, not a validity claim.

That distinction is where most capability business cases fall apart. A validity coefficient tells you whether an instrument works. A utility estimate tells you what the working is worth. The second number is far more persuasive to a finance committee and far easier to get badly wrong — and when a simulation applied the standard corrections across 10,000 scenarios, the median estimate fell by 91%.

## The formula every utility estimate is built on

The Brogden–Cronbach–Gleser model is the base case. In the notation used in the [personnelSelectionUtility package documentation](https://cran.r-project.org/web/packages/personnelSelectionUtility/vignettes/continuous-monetary-utility-bcg-boudreau-sturman.html):

**ΔU = Ns × T × rxy × SDy × Z̄xs − C**

- **Ns** — the number of people you select
- **T** — the tenure horizon, in years, over which the benefit accrues
- **rxy** — the operational validity of the procedure
- **SDy** — the standard deviation of job performance expressed in money
- **Z̄xs** — the mean standardised predictor score among those selected, which rises as your selection ratio tightens
- **C** — the total cost of assessing everyone, not only those hired

Two things about this formula matter more than the arithmetic.

First, **validity has to be incremental.** The textbook version compares your new procedure to random selection, which nobody uses. If you already run an interview, rxy must be replaced by the difference between the new procedure's validity and the old one's. Skipping this is the single most common inflation in a capability business case, because it credits your new test with everything your existing process was already achieving.

Second, **cost is cost per applicant, not cost per hire.** If you assess 2,000 campus candidates to make 80 offers, C covers all 2,000. Procurement models shape this term directly: a seat licence makes C a fixed annual figure you must amortise and defend, while per-candidate pricing — AssessAll charges ₹30 / US$0.50 per credit, with 100 free credits on individual signup and 250 for corporate accounts — makes C a countable line item that scales with the funnel you actually ran. The adjustments below treat fixed and variable costs differently, so this is not a cosmetic difference.

## SDy is the term that decides the answer

SDy is the hardest input to estimate and the one your conclusion is most sensitive to, because it enters the formula linearly. Double it and you double the answer.

The long-standing rule of thumb from Schmidt, Hunter and Pearlman (1982) puts SDy at roughly **40% of mean pay** for jobs of low to medium complexity and around **70%** for high-complexity work. Alternative procedures disagree substantially: the global percentile method tends to produce values about **1.8 times larger** than CREPID or the 40% rule on the same job.

The practical implication is not that one method is correct. It is that a single-point SDy estimate is indefensible. Estimate it at least two ways and publish the range. An estimate presented as a band invites a conversation about assumptions; one presented as a point invites a conversation about whether you are to be trusted.

## Five adjustments cut the median estimate by 91%

Michael Sturman's simulation in the *Journal of Management* is the most useful single result in this literature. He generated 10,000 scenarios and applied five documented adjustments to the basic model:

1. Economic variables — variable costs, taxes and discounting
2. Employee flows across multiple periods
3. Probationary periods, and the people who do not survive them
4. Multiple or already-existing selection devices
5. Departures from top-down hiring, including rejected job offers

Applied together, these produced a **median change of −91%** and a **mean change of −98%**. The *smallest* reduction across all 10,000 scenarios was **71%**. And in **16% of scenarios the adjusted estimate was negative** — the programme destroyed value. ([Sturman, 2000](https://doi.org/10.1177/014920630002600206))

Reworking a published example made the point concretely. An original estimate of **$59,657,532** became a mean of **$2,228,170** after all five adjustments, with a median of **$1,738,861** and a range running from a **loss of $2,577,238** to a gain of **$17,162,452**.

Note what that range means. The adjusted figure is not simply smaller; it is wide enough to cross zero. A programme that looked like a guaranteed $59 million is, on honest accounting, a bet whose sign you cannot state with confidence.

## The bigger number did not win the argument

Here is the finding that should change how you present this work. Latham and Whyte asked managers to evaluate a recommendation to adopt a valid selection procedure. Managers who were shown the utility information rated the proposal **less** favourably than managers who were not. ([Latham & Whyte, 1994](https://doi.org/10.1111/j.1744-6570.1994.tb02408.x), *Personnel Psychology*)

The result has been contested in the right way. Carson, Becker and Henderson tested a shorter, less complex explanation of the same analysis and obtained significantly more favourable reactions than the longer version — while still describing the resulting ratings as disappointingly low. ([Carson, Becker & Henderson, 1998](https://doi.org/10.1037/0021-9010.83.1.84), *Journal of Applied Psychology*)

Read together, those two studies say something specific: the problem is presentation complexity, not the existence of a number. A dense, assumption-laden derivation reads as advocacy. Managers discount it, and discount the presenter with it.

Adoption data is consistent with that. Macan and Highhouse found **46%** of respondents who had presented an HR activity to senior management had used utility analysis; a later survey of Swiss organisations found **fewer than 10%** using it at all ([König et al.](https://www.uni-saarland.de/fileadmin/upload/lehrstuhl/koenig/PDFs-Publikationen/KoenigBoeschReshefWinkler_preprint.pdf)).

## How to produce an estimate someone will believe

1. **State the baseline procedure explicitly.** Name what you do today and use incremental validity, not absolute validity.
2. **Source rxy from current meta-analysis, not vendor claims.** [Sackett and colleagues' 2022 re-estimates](https://psycnet.apa.org/record/2022-17327-001) put structured interviews at .42, job knowledge tests at .40, biodata at .38, work samples at .33 and cognitive ability tests at .31 — materially lower than the figures in circulation for two decades.
3. **Estimate SDy two ways and report the band.**
4. **Count every applicant in C,** plus administration and candidate time.
5. **Apply the economic adjustments.** Variable costs, tax and a discount rate, at minimum. If you cannot, say that your figure is an unadjusted upper bound.
6. **Run the negative case.** Report the scenario in which the programme loses money, and the assumptions required to get there.
7. **Lead with the decision, not the derivation.** One sentence on what you recommend, one range, and the two assumptions the range is most sensitive to. Put the algebra in an appendix.

## When a utility number is the wrong tool

Three situations, honestly.

**When the question is legal rather than economic.** Whether a procedure is defensible under the [Uniform Guidelines on Employee Selection Procedures](https://www.ecfr.gov/current/title-29/subtitle-B/chapter-XIV/part-1607) or the [EEOC's guidance on tests and selection procedures](https://www.eeoc.gov/laws/guidance/employment-tests-and-selection-procedures) does not turn on its return. Adverse impact is not priced; it is evidenced, documented and justified against job-relatedness. A high utility figure is no defence at all.

**When you have no local validity evidence.** Utility inherits every weakness in the rxy you feed it. If your validity coefficient comes from a borrowed study on a different population, the monetary estimate carries that uncertainty multiplied by four other uncertain terms. Running a pilot to establish a local coefficient — the kind of design work AssessAll's custom assessment services exist to support — is a better use of a quarter than modelling a number you cannot ground.

**When the decision is already made for other reasons.** If capability investment is going ahead because a regulator, a client contract or a growth plan requires it, a utility estimate adds risk without adding information. Measure the outcome instead.

## The takeaway

A utility estimate is a defensible way to value an assessment or training decision, but only when it is adjusted, banded and presented briefly — the unadjusted figure is, on the best available simulation evidence, roughly an order of magnitude too high. Report a range that includes the losing case, and lead with the recommendation rather than the arithmetic. The credibility you are protecting is the thing you are selling.

---

Source: https://www.assessall.com/blog/utility-analysis-explained-five-adjustments-cut-the-median-estimate-by-91
